Monday, July 1, 2013

Chama Steam Fall Madness 2013



Saturday, Sept. 28: check in, night photo shoot in the Chama Yard. 

Sunday, Sept. 29: Freight train with mid-train helper to Cumbres Pass. BOYH #315 and #463 will be on this train, which will likely morph into TWO trains to Antonito, with numerous runbys. Monday, 

Sept 30: TWO Freight trains from Antonito to Osier. #463 will head a chase train. #315 will head a stock train (limited passenger space). We will stop for runbys at strategic spots along the route. On Monday night we will have an evening photo shoot AND a night photo shoot at Osier. Those who wish to stay in their motel room will be transportaed back to Antonito by van. Those wgo want to stay at Osier will spend Monday night “roughing it” in the building at Osier. Cots and sleeping bags will be provided. We will make CERTAIN that you are as comfortable as possible! 

 Tuesday, Oct. 1: TWO freight trains will leave Osier before dawn and head for the morning light, then stop for breakfast at Osier. We will then head back to Antonito, with numerous runbys along the route. At this point we MAY pick up another crew in Antonito and do an evening Lava Turn. 

Wednesday, October 2: Freight train from Antonito to Chama Numerous runbys along the route. This train will include #315 and #463 Wednesday, Oct. 2, 7:00 PM: Free buffet dinner. Venue to be announced.

  Chama Steam Excursions

Thursday, February 21, 2013

Sunday, January 27, 2013

Chama Steam Fall Madness 2013

Chama Steam Fall Madness 2013


Full fare including night shoot, lunch on the train,
dinner and breakfast at Osier, buffet dinner on Wednesday night,
and room for five nights: $2020.00 Double occupancy
(add $320 for single room if available).
 
Early bird signup by February 27 2013: $1820.00.
Train only (no meals, no room, no night shoot: NOT AVAILABLE.


For more information, please call Jay at 575-756-1674 or e-mail jay@chamasteam.com> To sign up, send check or postal money order to
Jay Wimer
PO Box 291
Chama, NM 87520

Chama Steam

 

Friday, January 25, 2013

Restoration of Antonito train depot delayed




Currently, the railroad has not allowed the town access to the easement on the east side of the building near their train tracks. However, Jose Gurule and Jay Warner, town trustees, plan to set up an appointment with Matt Abbey, general manager of the railroad to try and resolve the issue as soon as possible. The town had their attorney draft a letter to the railroad explaining the issue and Abbey sent a reply letter indicating that the railroad might be receptive to the idea, but requested a letter directly from the town. Abbey was not available for comment. The town would like to have, at least, temporary, access to the eastern easement so that they can have enough room to perform the restoration work on the building in the spring. Should this future meeting with Abbey prove fruitful the project can proceed as planned. However, if the railroad still refuses to grant access to the easement the town may need to find other options, and sources of funding to continue with the restoration project.

http://www.conejoscountycitizen.com/v2_news_articles.php?heading=0&story_id=956&page=72